This is an old revision of the document!


Natural Born Skiffeurs

The limace Project is to be built over the Slug plug lent to the french fleet.

The boat should looks like Atum Bom with racks.

The boat met the Water on the 1st of april !

She has since done a few race with some success.

After a few breakages (rudder cas, spreader) the boat has been proven fast and well balanced.

2007/2008 winter will is dedicated to some upgrade and finalisation which have never been done.

First of all, the hull will be completely faired and repaint to have a smooth aspect. A new rudder and board will be done and maybe some lethal weapons.

Unveiling day.

was her first time for NBS. In a gently unsteady breeze (4-12 knts) we have been out for the first time.

First good news she floats !!!! The boat seems well born. She is light, strong, responsive and equilibrate. She isn't really hight on the water.

Bad news, the boom is about 10 cm short. Some spliced have moved and some ropes are too long but I did it willingly as it is always hard to theoricly define rope lenght on the shore.

I only broke the jib track due to a mistake from mine. I forgot to add a fix point at its middle. Another identified point to improve is the chute which seems to have to close angle which means the spinnaker doesn't retrieve gently.

2692-20070404c.jpg Ready

2692-20070404d.jpg She floats !

2692-20070404e.jpg

2692-20070404i.jpg D-Day -1 last adjustments

As I had so much work to do, I do not have that much pictures :(

2692-20070404f.jpg First time withe the mast on. The Jib is so huge !

2692-20070404g.jpg

2692-20070404i.jpg

2692-20070404h.jpg Fittings on

2692-20070211g.jpg

2692-20070211e.jpg Racks glued

2692-20070211d.jpg Rudder straight from the mould

2692-20070211c.jpg

2692-20070211b.jpg First layer of coat

2692-20070211a.jpg Launcher throat

2692-20070125c.jpg

Deck layered with 200 g 0/90 carbon and 160 biax E-Glass + reinforcement on some parts

2692-20070125a.jpg

Deck glued

2692-20070125b.jpg

Tube on

2692-20070125e.jpg

Snout On

2692-20070125d.jpg

Central Bulkhead glued and tubes ready.

hyde sails ordered

C-tech mast received with some damages :(

After an intense corporate party wednesday night

2692-20061218c.jpg

Transom and mid lenght bulhead glued.

I also finished the bulkheads and coated the deck foam.

2692-20061218b.jpg

That's a rock n' roll time, cutting the hull for the daggerbord case !

2692-20061218a.jpg

Positionning the daggerboard case

2692-20061211f.jpg

With my only mate

2692-20061211e.jpg

Floor Airex cut

2692-20061211d.jpg

Sides cut

2692-20061211a.jpg

Central bulkhead glued

2692-20061211b.jpg

Stem fixed

2692-20061211c.jpg

Transom cut

2692-20061201a.jpg Side carbonned, waiting for a stem

2692-20061127b.jpg Inside coating + sanding + cutting frames for bulkheads

2692-20061127a.jpg External Skin raised

2692-20061121a.jpg Side foam raised + coating + sanding

2692-20061112j.jpg Preparation of the sides

2692-20061112h.jpg First part of the hull poped out of the plug

2692-20061112i.jpg

2692-20061112n.jpg Vacuum bagging

2692-20061112g.jpg Ready for vacuum bagging

Mast, prod, boom, racks ordered at C-techC-tech

2692-20061112m.jpg

2692-20061112e.jpg Small patch on an unglued part

2692-20061112d.jpg The same after fairing

2692-20061112c.jpg Airex C70-75 8mm

2692-20061112b.jpg First layer of 200g/m² carbon (without resin)

2692-20061112a.jpg Slug plug

Materials ordered at Sicomin

2692

2692-20070404c.jpg

  • Construction: Carbon and Foam
  • Location: Paris (FRANCE)
  • boats/2692.1372175715.txt.gz
  • Last modified: 2020/12/09 19:15
  • (external edit)