Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
boats:2686 [2013/02/12 21:20] – [Primal Scream] adminboats:2686 [2023/03/15 15:46] (current) oliver_morrell
Line 1: Line 1:
- +===== Primal Scream =====
- +
-====== Primal Scream =====+
- +
  
 Primal Scream is an "Easy Wan" Design Cherub, it is the first Cherub to be designed to the 2005 rules. Designed around a sail plan of 15.5sqm upwind then an additional 21sqm asymmetric spinnaker. Primal Scream is an "Easy Wan" Design Cherub, it is the first Cherub to be designed to the 2005 rules. Designed around a sail plan of 15.5sqm upwind then an additional 21sqm asymmetric spinnaker.
- 
- 
  
 The plan for the design was for a slightly more forgiving boat than AquaMarina to give a good base for learning to control the new rig. It was designed and built for [[people:phil alderson]] with the help of Dave Low.  The plan for the design was for a slightly more forgiving boat than AquaMarina to give a good base for learning to control the new rig. It was designed and built for [[people:phil alderson]] with the help of Dave Low. 
- 
- 
- 
- 
  
 === Where the stuff for Primal Came from === === Where the stuff for Primal Came from ===
Line 23: Line 13:
   * Mast http://www.c-tech.co.nz/   * Mast http://www.c-tech.co.nz/
  
-  * Centerboard http://www.bloodaxeboats.co.uk/ +  * Daggerboard http://www.bloodaxeboats.co.uk/
- +
- +
- +
  
 ==== After the Build ===== ==== After the Build =====
- 
 After building the boat we get to sail her, and she has proved to be a manageable handful. The hull has a lot more static stability than Aqua which has made for a good learning platform to get used to the bigger rig and sailing twin wire. After building the boat we get to sail her, and she has proved to be a manageable handful. The hull has a lot more static stability than Aqua which has made for a good learning platform to get used to the bigger rig and sailing twin wire.
- 
- 
  
 === Some Sailing Stories === === Some Sailing Stories ===
  
-  *  [[news:20050731]] +  *  [[news:2005:0731]]
- +
-  *  [[news:20050831]]+
  
 +  *  [[news:2005:0831]]
  
  
Line 46: Line 28:
  
   *  [[tech:new chute]]   *  [[tech:new chute]]
- 
- 
  
 ===The Refit=== ===The Refit===
  
 Following an unscheduled visit to some rocks at Largo Bay Primal is feeling a bit sorry for herself so there will be quite a few repairs and modifications to be done over the winter. Following an unscheduled visit to some rocks at Largo Bay Primal is feeling a bit sorry for herself so there will be quite a few repairs and modifications to be done over the winter.
- 
- 
  
 ==== 1st April 2007 ==== ==== 1st April 2007 ====
Line 60: Line 38:
  
 {{ boats:2686-20070401a.jpg?500 }} {{ boats:2686-20070401a.jpg?500 }}
- 
- 
  
 ==== 27th March ==== ==== 27th March ====
  
 Starting to get some fitting mounting points in place. Starting to get some fitting mounting points in place.
- 
- 
  
 {{ boats:2686-20070327b.jpg?500 }} {{ boats:2686-20070327b.jpg?500 }}
  
- +Mast bridge in place around the now obligatory section of RS800 mast that all rebuilt Cherubs must include somewhere in the structure
- +
-Mast bridge in place around the now obligitary section of RS800 mast that all rebuilt Cherubs must include somewhere in the structure +
- +
  
 {{ boats:2686-20070327a.jpg?500 }} {{ boats:2686-20070327a.jpg?500 }}
- 
- 
- 
- 
  
 ==== 24th March  ==== ==== 24th March  ====
  
 The new mast bridge, jib track thing ready to go in, I am not sure what to call it as it is not a foredeck, or a space frame so mast bridge will have to do. The new mast bridge, jib track thing ready to go in, I am not sure what to call it as it is not a foredeck, or a space frame so mast bridge will have to do.
- 
- 
  
 {{ boats:2686-20070324a.jpg?500 }} {{ boats:2686-20070324a.jpg?500 }}
- 
- 
  
 ==== 22 March  ==== ==== 22 March  ====
Line 98: Line 60:
  
 {{ boats:2686-20070322a.jpg?500 }} {{ boats:2686-20070322a.jpg?500 }}
- 
- 
- 
- 
- 
- 
  
 ==== 15th March 2007 ==== ==== 15th March 2007 ====
  
 The new deck has now been bonded in place and is almost complete. The new deck has now been bonded in place and is almost complete.
- 
- 
- 
- 
- 
- 
  
 {{ boats:2686-20070315a.jpg?500 }} {{ boats:2686-20070315a.jpg?500 }}
  
 View of new deck from the front View of new deck from the front
- 
- 
  
 {{ boats:2686-20070315b.jpg?500 }} {{ boats:2686-20070315b.jpg?500 }}
- 
- 
  
 The back of the boat showing the new transom and the Gantry nearing completion. Just the control mechanism and one support strut is still required, they will be fitted after the deck is in place. The back of the boat showing the new transom and the Gantry nearing completion. Just the control mechanism and one support strut is still required, they will be fitted after the deck is in place.
  
 {{ boats:2686-20070315a.jpg?500 }} {{ boats:2686-20070315a.jpg?500 }}
- 
- 
  
 ==== The start of the rebuild Feb 2007 ==== ==== The start of the rebuild Feb 2007 ====
- 
- 
  
 Gantry starts to come together. Gantry starts to come together.
  
 {{ boats:2686-20070225a.jpg }} {{ boats:2686-20070225a.jpg }}
- 
- 
  
 The new deck being made with first layer done and the foam going on. The hull can be seen in the background with the new stump in place. The new deck being made with first layer done and the foam going on. The hull can be seen in the background with the new stump in place.
- 
- 
  
 {{ boats:2686-20070218a.jpg }} {{ boats:2686-20070218a.jpg }}
  
- +The Deck Mould is built
- +
-The Deck Mold is built +
- +
  
 {{ boats:2686-20070204a.jpg }} {{ boats:2686-20070204a.jpg }}
- 
- 
- 
- 
  
 ==== Dismantling Jan 2007 ==== ==== Dismantling Jan 2007 ====
  
 The strip out begins. and more damage is uncovered. including cracks to the shroud bulkhead probably from when the support of the mast bridge was removed with full rig tension on. The strip out begins. and more damage is uncovered. including cracks to the shroud bulkhead probably from when the support of the mast bridge was removed with full rig tension on.
- 
- 
  
 {{ boats:2686-20070118a.jpg?500 }} {{ boats:2686-20070118a.jpg?500 }}
- 
- 
  
 All the damage is now removed as well as the bits that needed to go for access to asses the damage plus some bits that needed to go to make way for the new layout. All the damage is now removed as well as the bits that needed to go for access to asses the damage plus some bits that needed to go to make way for the new layout.
- 
- 
  
 {{ boats:2686-20070107a.jpg?500 }} {{ boats:2686-20070107a.jpg?500 }}
- 
- 
  
 All it needs now is to be put back together. All it needs now is to be put back together.
Line 185: Line 107:
 {{ boats:2686-20060902a.jpg?500 }} {{ boats:2686-20060902a.jpg?500 }}
  
 +{{gallery>*:boats?*2686*.jpg}}
  
- +===== 2686 ===== 
- +{{2686-200606xxa.jpg?300}}
- +
-=== 2005 Pictures === +
- +
- +
- +
-{{gallery>boats?showname?3?only2686-2005}} +
- +
- +
- +
-=== 2006 Pictures === +
- +
-{{gallery>boats?showname?3?only2686}} +
- +
- +
- +
- +
- +
- +
- +
- +
- +
- +
- +
-====== 2686 =====+
- +
-{{2686-200606xxa.jpg?250 }}+
  
   * Name: [[boats:2686|Primal Scream]]   * Name: [[boats:2686|Primal Scream]]
- 
   * Designs: [[designs:Easy Wan]]   * Designs: [[designs:Easy Wan]]
- 
   * Builder: Dave Low and Phil Alderson    * Builder: Dave Low and Phil Alderson 
- 
   * Construction: Foam Carbon to the 2005 rules with [[http://www.c-tech.co.nz/|C-Tech]]/[[http://www.rmwmarine.com|RMW Marine]] rig and T-Foil rudder   * Construction: Foam Carbon to the 2005 rules with [[http://www.c-tech.co.nz/|C-Tech]]/[[http://www.rmwmarine.com|RMW Marine]] rig and T-Foil rudder
- 
   * Location: France   * Location: France
- 
- 
  • boats/2686.1360704003.txt.gz
  • Last modified: 2020/12/09 19:15
  • (external edit)